Half-inclusive house decoration including what the house decoration half a pack of advantages and disadvantages

At present, there are three types of decoration: All-inclusive, Half-package, and Clear-bag. However, people nowadays will choose half-packages for more decoration because the owners will have a control over the quality and quality of the decoration materials. The package will not consume too much energy, so half-package is the preferred decoration method for office workers. Then, the next Xiaobian for everyone to introduce the half-inclusive house decoration, including the decoration and half the advantages and disadvantages of the house decoration.

Which half of the house is included in the renovation?

1. The owner mainly purchases the main materials, and the design and shop materials are provided by the decoration company. In this way, we do not need to consider the decoration design. We only need to purchase materials; however, it takes a lot of time to run Building materials market. Then we must pay attention to signing the contract to see what is provided by the decoration company, which is their own purchase, or later into the renovation company has drilled the loopholes, make what they want to buy.

2. For the semi-package repair company, it is responsible for all construction and worker arrangements, responsible for indoor structural transformation, responsible for hydropower reform construction, drainage design and installation, circuit design and installation, sanitary fixture installation, etc.; responsible for mud water construction (backfill, ground leveling, waterproof treatment, paste Wall tiles, floor tiles, etc.); Responsible for wood construction (ceilings, modeling and some on-site production of furniture, etc.); responsible for paint construction (wall, wallpaper or latex paint, furniture paint, etc.).

3, for some sanitary ware and the like may be installed by the vendor package, if the seller does not package installation, you can require the decoration company to complete, but this should be agreed in advance.

House decoration half package advantages and disadvantages

1. Advantages: There is more initiative in purchasing the main materials. The main decoration materials can be purchased by themselves. It is more secure both in terms of safety and economy; the materials can be provided by the construction team.

2. Disadvantages: Half a package needs to spend a lot of time to look at materials in the building materials market. It takes more time and effort and can't be easily renovated. For some self-purchased materials to be registered, the provincial decoration company will make up for the loopholes and make itself worth buying.

Editor's summary: The half-inclusive package of the house is included. The advantages and disadvantages of the house's decoration are introduced here. We hope to help everyone. If you want to know more related information, you can pay attention to this website information.

Half package repair small house half package house decoration half bag including

1. Technical standard: BS EN 10202, DIN EN 10203, GB/T2520 , JIS G3303
2. Steel type: MR, SPCC
3. Thickness: 0.115 - 0.50 mm
4. Roll width:  600 - 1050 mm
Tin Coating: ordinary 2.8 or 2.8g and 5.6g or 5.6g, we can produce according to customer's requests
Widely apply to industrial packagings and food packagings.

Electrolytic Tinplate Coil

Electrolytic Tinplate Coil,Coil With Color Printing,Electrolytic Tinplate,Electrolytic Tinplate Sheet In Coil

Jiangsu Global Packing Technology Co., Ltd , https://www.cntinplate.com