Pu stadium material features Pu stadium construction process

PU course materials are a new generation of course materials developed on the basis of PU course materials. The material is scientifically compounded by a polyurethane (PU) material and a material containing a silicone component, and the produced material is used on a ball surface layer to fundamentally and effectively solve the problem of professional performance and environmental protection of PU course materials . The insufficiency in terms of service life, daily maintenance, etc., has revolutionary innovation performance and is a new generation of environmentally-friendly products that replace the two-component PU.

Pu Stadium Material Features

Why use PU material, mainly because it has the following characteristics, makes it popular with customers.

1. Economy - Low overall cost of use, no special maintenance, easy cleaning, and ideal cost-effective product.

2.Environmental Protection - All the indexes of this product have reached the national interior decoration hygiene standards. During the use and construction process, no toxic and hazardous substances are produced. It is a truly environmentally friendly product.

3, excellent weather resistance

4, superior wear resistance

5, strong stain resistance

Coating characteristics

Unique: Silicon PU contains silicone components, while silicone is not easily contaminated, so it does not require special maintenance and is easy to clean;

Durable: weather resistance and abrasion resistance, even in the ultraviolet, ozone, rain and high temperature and other climate environment can also maintain long-term bright color, no fading, powdering, hard, soft;

Environmental protection: Silicon PU is a one-component PU material, water is a curing agent, does not leave harmful chemical components, is a truly environmentally friendly material;

Economy: low cost and high cost performance. It can be laid directly on the old and new concrete floor, greatly reducing the cost of the ground floor treatment.

Pu stadium construction process

First, material mixing and stirring

1. The padding site shall be paved with adhesive tape to ensure the ground is clean. When the material is activated, the outer edge of the cover must be cleaned first;

2. Pour the material into a mixing drum according to the prescribed weight mixing ratio. And should be poured into the curing agent (transparent liquid), and then poured into the main agent (color liquid) is appropriate;

3, stirring, the mixer (device) should be moving up and down, so that the material is fully mixed. Also should pay attention to the bottom of the mixing tank and the edge, whether mixed;

4. The amount of materials to be mixed should consider the area of ​​the construction area and the speed of construction operations. It is advisable that the thickness of one construction does not exceed 3 mm.

5. The basketball court is a solid rectangular surface with no obstacles. For the FIBA ​​main official game, the measurement of the basketball court should be measured from the inner edge of the border line. For all other competitions, FIBA’s appropriate department reserves the right to approve existing courses within the following size ranges: 4 meters in length and 2 meters in width, as long as the changes are proportional to each other. Ceiling or minimum obstruction property height of at least 7 meters. Basketball court lighting should be uniform and the luminosity should be sufficient. The placement of lighting equipment must not interfere with the player’s vision. The size of all new basketball courts must be consistent with the requirements of the FIBA's main official competition: 28 meters long and 15 meters wide.

6. The basketball court is based on the soul of the entire venue. The quality of a venue depends greatly on the quality of the foundation project. It can be said that the foundation determines everything and a good foundation is the beginning of success.

7. With the development of urbanization, the space that we can use to build sports venues is becoming scarce, and basketball is a hot sport for the masses. The main thing is that the basketball court occupies a small space and can be built under any conditions. It provides good basic conditions for the development of basketball.

Summary: The relevant information about the characteristics of PU stadium materials and the construction process of PU stadium was introduced here. I hope this article will be helpful to everyone. If you still have something you don't understand, you can leave a message to Xiaobian at the bottom. We will answer your questions as soon as possible.

Decoration materials brand decoration materials list decoration materials knowledge hydropower materials brand own decoration house process

4 pieces curtain

4 pieces curtain,High Quality 4 pieces curtain,4 pieces curtain Details, Huanghua Techo Building Material Co., Ltd.

Huanghua Techo Building Material Co., Ltd. , http://www.insectsscreen.com