Renovation of the price of water and electricity renovation home improvement lectures: unveiled home improvement packages repeatedly exceeded the mystery of the budget

The frequency of water and electricity use in the home is very high. Therefore, in the process of renovation and hydropower renovation , people have to pay particular attention to the decoration. Try to make some common hydropower problems be prevented in the early stage of construction. This requires a professional water and electricity installation master. Professionalism is reflected in installation specifications and installation experience. So, what is the price of renovated hydropower in 2015? When we carry out renovation and hydropower reforms , we must carry out the budget of our family's hydropower reform according to the current market price of the market and the overall construction cost of hydropower reform. During the hydropower reform, we must budget all kinds of problems during the renovation of hydropower to avoid the emergence of Hidden danger.

Decoration and hydropower reform steps

Hydropower location

The first step of hydropower reform is the positioning of hydropower, which is based on the needs of users to determine the location of the whole house switch socket and the position of the waterway interface. The plumber should follow the position of the switch, socket, and faucet and follow the route to the user. . Moreover, we should pay attention to the principle of “taking water to the sky and electricity to the ground”. That is to say, the water pipes should go to the ceiling and the strong and weak electricity should go to the ground as far as possible, and the strong and weak electricity cannot cross each other and the parallel distance is greater than 30 centimeters.

Installation design

The installation and design of distribution boxes and information boxes must be considered for ease of use, concealment, and safety. Attention must also be paid to the direct connection with the external main line; the electrical lines must not be hidden in the building's load-bearing walls or columns.

Line design

The electrical circuit design of sockets, switches, and lamps must take into account the variability of the interior space, prepare for possible different space usage conditions, and reduce the barriers to re-planning the design of some users during use, such as desks, decorative cabinets, and electrical appliances. The impact of equipment movement on electricity use and water consumption should also be taken into account. The price of new embedding lines and changeover lines is not the same.

safety factors

In the case of large luminaire weights, pay attention to the embedded load-bearing components in the ceiling, not directly on the wooden wedge, so as to avoid indoor unsafe factors.

Slot positioning

After hydropower positioning, the next step is to slot. The slot played by a good groover is basically a straight line, and there are basically no hairs in the groove. Before making a groove, be sure to have a plumber mark all the water and electricity on the wall. Remember to compare the hydropower diagrams and see if they are consistent.

Sealing slot

Fixed cassette: In addition to the kitchen and toilet cassettes protruding from the wall 20mm, other cassettes are required to be flush with the wall surface. Several cassettes are required to be on the same level. Fixed PVC pipe: Ground PVC pipe requires a fixed interval of one meter. The PVC pipe requires that each interval must be fixed; the wall slot PVC pipe must be fixed at intervals of one meter. Sealing groove: The wall surface and ground surface after sealing the groove must not be higher than the plane.

Buy building materials

When the waterway is reformed, be careful to be clean around. When waterway reconstruction is contracted, it is better to indicate the materials used for waterway reconstruction. In addition, the size of the water pipe in the original room should be taken into account in the reconstruction of the waterway, and the pipe of the external water pipe should be matched with the original water pipe. Hot and cold water pipes should be left hot right cold, the spacing is generally not less than 20cm, depending on the distance between the hot and cold pipe taps.

  

Decoration and hydropower transformation precautions

Precautions for decoration of hydropower renovation First, go through the living room's water pipe from the top, the kitchen bathroom is covered with aluminum buckle plate ceiling, go through the corner of the living room along the corner, wrapped with plaster line, if there is a leak can be immediately found. The hydropower reform master made two holes respectively during the slotting. When the pipe was laid, the two water pipes were naturally separated to ensure the spacing of the hot and cold water pipes, which reduced the safety hazard of the water pipes. Look at the following Xiaobian for everyone to introduce another issue of decoration and hydropower reform.

Renovation of water and electricity renovation Note two, pay attention to the quality of decoration pipes, select a trusted big brand as a decoration material, so as not to cause unnecessary trouble in the daily life. At the same time, we should communicate well with the master of hydropower reform, and place the faucets at home so that the spacing between the sink and the faucet is as reasonable as possible. Renovation of hydropower is a task that requires special details. In order to have fewer hydropower problems at home later, it is time to learn more!

Notices on the decoration of hydropower renovation 3. The direction of the pipeline must be kept horizontal and vertical. Although there is little impact on life in the slightest inclination, professional hydropower reforms must insist on doing better. Sometimes the emptying of the ground is not caused by the improper construction of the mason. It is caused by the problem of the spacing of the ground line pipe. It is required that the floor slabs of the master builders of the hydropower reformers should be arranged side by side with more than 3 rows, with a spacing of more than 20 mm. There should be a proper distance, and the cement can be filled in. There is no emptying.

Renovation of water and electricity renovation notices Fourth, in order to ensure the uniform position of the switch socket in the future, before the slotting master of water will be playing on the wall line, but also unified use of cup sparse connection, so that in the future there will be no difference in the level of the socket . There is also a point of attention to the hydropower reform process. Wires must be insulated.

  

How much money for renovation of hydropower in 2015 (90 square meters for example)

1. General decoration companies sometimes have the same person for hydropower; some are done separately.

Plumbers, as a family, were previously all-inclusive, what was in the kitchen, what was in the bathroom, what was the balcony, and so on.

For example, 90 square meters, kitchen sink, natural gas water heater; bathroom shower, toilet, washbasin, mop pool; balcony sink, washing machine.

2, open slot, take the leading all get good, last year's price is 450 yuan, duration 2-3 days.

3, electrician, formerly all-inclusive, starting from the open slot to the end of the lamp, 90 square, the amount of work is relatively large, such as a lot of switches, chandeliers, etc., calculated by 1500-2000.

Later, according to the square calculation, and according to the construction area, what we learned last year was 3.5--4 yuan per square.

It is said that now, according to meters, the wire is calculated according to meters, 90 square meters, you are normally connected to double, increase some sockets, wires have to spend 500-600 meters (all). There is also a weak line CCTV line.

4, the general 90 square, 2 rooms and 2 halls of the kind, the use of pipelines about 60 meters, about 600 meters of wire, 3-4 days before the slot, wiring, late 2-3 wiring, according to lights. According to last year's market, water money should not exceed 3,000 yuan.

Editor's summary: The above is the decoration of the latest price of water and electricity renovation home improvement lectures: unveiled home improvement packages repeatedly over the budget mystery related presentations, hydropower reform, is the initial stage of every home improvement, of course, is the most important basis for future family life safety. In the decoration, hydropower reform is a very important link, related to ease of use, and even safety issues. Therefore, everyone should pay attention to hydropower reform, from the previous design, to the construction of hydropower materials and hydropower, and then to the actual drawing of hydropower.

Home improvement hydropower reform hydropower renovation home decoration decoration decoration home decoration design

Magnetic Door Curtain

Normal Design:magnet
Magnetic Door Screen opens easily then closed itself behind you using powerful magnets.
So if your hands are full or you have a forgetful  family member,you can still let fresh air in and keep annoying bugs out! It goes up in seconds with no tools required and stays up all season long. Plus, it folded up for easy storage.
100%polyester   magnet   Velcro for fixing 
DIY
Size:100x210cm,100x220cm,120x250cm,120x250cm,130x230cm
Color:white,black



Magnetic/Snap Screen Door Curtain

Snap Screen Door Curtain,Magnetic Screen Door Curtain,Snap Automatically Screen Door Curtain,Sliding Magnetic Screen Door Curtain

Hebei Charlotte Enterprise Co., Ltd. , https://www.cnscreening.com