Plastic Trough Installation Steps What to Do When Installing Troughs

In our renovation process, the transformation of hydropower is very important. The protection of electric wires can not only protect the safety of the decoration workers, but also bring security to family life afterwards, and the plastic trunking plays a very good role in protecting the electric wires. The effect, then what Xiaobian wants to share for everyone today are the installation steps of the plastic trunking and the precautions for installing the trunking.

Plastic slot installation steps

1. Line positioning

The first step in the installation of the plastic trunking is the positioning of the bullet line. During the positioning of the bullet line, the protective tube should be used for protection. At the same time, the height of the protective tube must be taken into consideration, and the distance must be maintained more than one metre from the ground.

2 fixed slot

The fixing of the trunking and the fixing of the trunking are troublesome. It requires the use of pre-embedded wood bricks and the need to use a cement mortar to level it. After the cement mortar has solidified, it is fixed to the wire trough floor using standard wood screws. Pre-embedded wooden bricks above.

3. The connection of the slot

There are many ways to connect the cable ducts. It is necessary to determine the connection method of the entire plastic trunking according to the actual environment and the related usage conditions. After the string is put in the line, connect the wires again. When connecting the wires, pay attention to the Correctly distinguish between protective ground, neutral and phase wires. The final part of the installation of the plastic trunking is the inspection of the relevant lines to check the performance of the insulation.

What are the considerations for installing the slot

1. Avoid cracks on the wall when installing. The installation should be changed according to the number of wires worn in the tube. There must be no more than four wires in the same tube. Disable the wire to fully fill the space in the tube, air conditioning, lighting, and sockets. Should be divided control, generally divided into four best, you can walk all the way through the air, air conditioning go all the way, go three to four sockets. Because it can help other normal work.

2. The distance between the power line, telephone line and TV line should be kept more than 50cm. The pipework should be fixed with the structure. All the switches, sockets, and lamp positions should be installed with a junction box if the line is too long. When there are many corners, a junction box should be set at a certain distance. Wire connectors are not allowed in the pipeline.

3. When installing, the pipeline should be installed first, and then the wire should be passed. This can avoid the phenomenon that the wire cannot be twitched when the line needs to be changed in the future.

4. Note that after installation, do not forget to have a picture of the home appliances, so that convenient maintenance and maintenance.

Xiao Bian summary: The above is the small section for everyone to share the plastic line slot installation steps and installation of trunking what are the matters needing attention, water and electricity decoration is the most important one in the home improvement process, hope that the above sharing can help you, if you need to know more For more relevant information, please continue to pay attention to the website of this website.