How to Accept the New Homeowner's Decoration

Many landlords accept and accept new homes for the first time. They generally have little experience and are prone to problems. Experts suggest that tools be prepared in advance. It is best to be able to ask someone who has experience in the construction or decoration industry to accompany them. Of course, there is also a special house inspection company. We can also hire professional house inspectors to check the new house, but we still have some understanding of the house inspection.

To be careful of:

First of all, it depends on whether the commodity house delivered to you and the contracted house to be purchased are the same. Xuzhou Decoration Company has the same structure as the original design. Whether the area of ​​the house has actually been measured by the real estate department and whether there is any difference in the area signed with the contract.

Second, we must look at the purchase of the entire building of the commercial building "construction project completion acceptance record", Xuzhou excellent decoration company, this table can explain that the building has been accepted by the relevant departments.

In addition, it is necessary to work together with the developers on the acceptance of the purchased commercial housing. Xuzhou Home Furnishing Company, this is a meticulous job, if the buyers do not understand the project quality and other related knowledge, it is best to find out the project's friends to complete together in order to find problems in a timely manner. The "Beijing Construction Project Completion Acceptance Record Form" states that the whole building is qualified, but it does not mean that the house purchased by the purchaser has no quality problems.

In the end, it is necessary to ask the developer for the “Quality Assurance Book” and “House Use Instruction” so that the quality problem can be repaired according to the contract.

Next is the tool to be prepared

5 meters tape, bucket, level ruler, hammer, camera, note, notebook and pen

Steps and methods

1. The installation of the electrical circuit should be smooth, firm and straight, and there should be a conduit over the wall. The conduit connections must be tight and the aluminum conductor connections must not be hinged or tied. When using pipe wiring, the connection point must be tight and reliable, so that the pipeline is structurally and electrically connected to the whole and has a reliable grounding; the meter should be installed (unit) to install the meter or reserve the table, and a grounding device;

2. Lighting equipment and other low-voltage electrical installation brackets must be firm, parts are complete, contact is good, location is correct; all connection points of lightning protection devices must be solid and reliable.

3. The elevator should be capable of accurately starting operation, selecting floors, leveling floors, and stopping floors. The noise and vibration of the traction machine must not exceed the specified value. Brakes, speed limiters, alarms and other safety equipment should be sensitive and reliable;

4. The quality of houses, including cracks in doors, windows and balconies, etc.; Xuzhou's decoration company (dangerous of cracks in balconies). Because the new house has a long empty time, there will be some dust and construction waste in the track of windows and doors, so it must not be I was very impulsive. When I felt a sense of obstruction when I tried to pull the doors and windows with brute force, I took a closer look and I could read it clearly with a broomstick.

5, equipped with air conditioners, washing machines, refrigerators, electronic water heaters, electronic gas stoves, electronic monitoring and alarm system of advanced housing, Xuzhou decoration company, should check the distribution equipment can operate normally, all kinds of pipeline is safe and reliable; configuration Residential houses with telephones should check whether the telephone line is open as scheduled, whether the answering effect is harmonious, and whether the telephone charge has been paid off. In addition, we also need to inspect water, sanitation, fire protection, and supporting facilities.

6. All kinds of roofs need to have smooth drainage, no water, no leakage. Flat roof should have heat insulation and insulation measures. Xuzhou Decoration Company should set up roof access holes in the common parts of more than three floors of houses; the roofs of balconies and three-storey houses should be organized for drainage, and outlets, trenches, and downfall pipes should be firmly installed. The interface is flat and does not leak. The surface layer and the base layer must be firmly bonded and not hollowed out. The overall surface is flat and does not allow defects such as cracks, peeling and sanding. Block surface layer (such as teak wood floor) should be flat, uniform and straight seams, no missing edge angle;

7. The relative elevations of the toilets, balconies, toilets and the adjacent ground shall meet the design requirements. There shall be no accumulation of water, no inverted flooding and leakage shall be allowed, and the ground shall be smooth and tight, and the joints shall be close together.

Balcony Containment House Renovation House New House Window Renovation Design Decoration Find Decoration Company Elevator Door Bathroom Design Bathroom Sliding Door Overall Bathroom Bathroom Door Bathroom Design Drawing

Magnetic Product

Neodymium Pot Magnets, Magnetic Phone Holder,Magnetic Name Badge

Zhongxing Steel Pipe Co., Ltd. , http://www.chinagongliciye.com